Manufacturing company · Weert
Condensate tank replaced at a manufacturing company in Weert
3D scan, prefabricated in the workshop and installed in 22 hours non-stop
- Condensate
Cookies on this site
Without consent, the site counts page visits without a cookie. Recognising returning visitors and measuring advertising only happen after consent. This can be changed later via Cookie settings at the bottom of every page. Privacy policy (Dutch)
These cookies remember the cookie choice, so the notice does not return on every page. No consent is needed for this.
With consent, the site recognises a returning visitor. Without consent, the site counts every page visit without a cookie: which page, and via which link or campaign the visitor arrived.
With consent, the site stores which Google ad brought a visitor to the site, so it can be measured whether that ad leads to an enquiry. Google may then also personalise ads. Once ads are running, Google also places its own cookies.
Breakdown? +31 (0)85 483 09 38 info@technischealliantie.com
Oudeweg 80, 6067 CA Linne LinkedIn
17 projects
A selection of projects completed by Technische Alliantie: filling stations, drinking water and industrial water installations, pipework and industrial installations. Filter by the medium that runs through the pipe.
Manufacturing company · Weert
3D scan, prefabricated in the workshop and installed in 22 hours non-stop
Drinking water production company
3D scan, 316L stainless steel pipework and installation in 10 weeks
WML · Maastricht
From the site isolation valves to the concrete chamber, with a pump set we assembled ourselves
Venlo
Combined DC Berkel and Tinq filling station, delivered turnkey, with diesel and AdBlue
Chemical company
In phases from steel to ductile iron, with new valves and fittings
Heide-Roerstreek, Roermond
A leaking ring main under the road, repaired while the network continued to supply in part
WML
A classic Citroën HY with a drinking water system and taps
DN600 manhole replaced with approved welding and a Kiwa coating
Lukoil · Gorinchem
2 underground 30 m³ tanks with smartflex pipework
TAM Oil Nederland · Terneuzen
New build of an unmanned filling station
Hitec Power Protection · Gaasperdammertunnel, Amsterdam
Fuel installation for emergency power, handed over in February 2018
Drinking water company in the central Netherlands
Steel pipe sections, finished to KIWA BRL-K 758 and externally inspected
Water company
Pipework and wellheads, pickled, disinfected and installed together with the client
Power station · Linne workshop
First inspection and acceptance of pipe sections in the workshop in Linne
Pump supplier
Designed by Engineering, built by Structural Steelwork, installed by Service
Coating company
Conditioning installation with heat exchangers, prefabricated and insulated
Designed together, built entirely in stainless steel, with its own clamping system
Briefly describe what needs to be done. We will contact you as soon as possible.