For a drinking water company in the central Netherlands, we fabricated a number of pipe sections as main contractor, to increase the operational reliability of a drinking water pumping station.
The pipe sections were fabricated by the Pipework department based on the design by Engineering. The steel sections were made to the client’s material specification and finished in accordance with the KIWA BRL-K 758 product certificate, which covers the coating suitability of metal products that are to be coated.
After an acceptance inspection by an external expert and an inspection of the weld quality by RTD, the pipe sections were given a KIWA-approved coating to the client’s specification.