Logo Technische Alliantie

Project

Pump pedestal for a pump supplier

Client
Pump supplier
Blue pump with motor, mounted on the new pump pedestal

Based on a specific request from a pump supplier, we constructed a pump pedestal using a 3D drawing. The pedestal was designed by Engineering, fabricated and assembled by Structural Steelwork, and installed on site by the Service department, including the pump.

On the inside, the pedestal was given a KIWA-approved coating; on the outside, it was coated in the RAL colour and paint composition the end customer wanted. The pump and pedestal were then aligned, assembled and taken to the client on a transport frame.