For our client, a water company, we fabricated pipework and wellheads in our DWT workshop.
After pickling and disinfection, the pipe sections were installed in the project together with the client.
Cookies on this site
Without consent, the site counts page visits without a cookie. Recognising returning visitors and measuring advertising only happen after consent. This can be changed later via Cookie settings at the bottom of every page. Privacy policy (Dutch)
These cookies remember the cookie choice, so the notice does not return on every page. No consent is needed for this.
With consent, the site recognises a returning visitor. Without consent, the site counts every page visit without a cookie: which page, and via which link or campaign the visitor arrived.
With consent, the site stores which Google ad brought a visitor to the site, so it can be measured whether that ad leads to an enquiry. Google may then also personalise ads. Once ads are running, Google also places its own cookies.
Breakdown? +31 (0)85 483 09 38 info@technischealliantie.com
Oudeweg 80, 6067 CA Linne LinkedIn
Project
For our client, a water company, we fabricated pipework and wellheads in our DWT workshop.
After pickling and disinfection, the pipe sections were installed in the project together with the client.
Briefly describe what needs to be done. We will contact you as soon as possible.